Save this image free of charge in 800 pixels for layout use (right click, Save as...)
|
|
Ref : S09041
Theme :
Space Shuttle - General (1045 images)
Title : Rollout of Space Shuttle Columbia from the Vehicle Assembly Building begins in
Caption :
(01/28/2002) -- Rollout of Space Shuttle Columbia from the Vehicle Assembly Building begins in the early light of morning. Columbia sits on top of the Mobile Launcher Platform. Underneath is the crawler-transporter, which carries the multi-ton vehicles to the launch pad. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the ACS, install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation
|
|